Built 1987 as a 2.4 million gallons per day plant
- Oxidation Ditch with Inter-channel Clarification
- Chlorine Disinfection
- Sludge disposal by Belt Filter Press
- Redundancy
Expansion/Upgrade in 2005 now makes it a 4.3 million gallons per day plant
- Oxidation Ditch with an External Clarification
- Ultra Violet Disinfection
- Larger Capacity Belt Filter Press
- Redundancy
Operates 24/7/365
Discharges to Silver Creek
In 2010 there were a total of 1,053,953,015 gallons of water processed
This is an average of 2.89 million gallons per day